Check Perforce project status
Besides indicating the current file status relative to the repository, JetBrains Rider integration with Perforce provides you with the accumulated view of the project files' statuses.
To view differences between the current state of the project files and the repository
Open the required project.
Go to .
Open the Commit tool window .
The status of each file is indicated by the color in which the path to the file is displayed.

To refresh the statuses of project files
JetBrains Rider provides two refresh modes for statuses of files under Perforce control.
Standard Refresh takes into consideration only the changes made through the JetBrains Rider integration with Perforce. This improves performance as it does not require connecting to the server. However, this approach does not let you know about the changes made outside JetBrains Rider, for example, right through the p4v client application.
Force Refresh considers all the changes made to project, both from JetBrains Rider and from any other application, for example, right through p4v client.
Open the Commit tool window .
Do one of the following:
To run Standard Refresh, click the Refresh toolbar button
or press Control+F5.
To run Force Refresh, click the Force Refresh toolbar button
.